What a Complying Development Certificate Actually Is

The fast route through the NSW planning system. Whether your project can use it is decided by the block, not by preference.

Single-storey contemporary home with a low hipped roof, deep eaves and full-height glazing behind a clipped hedge

A Complying Development Certificate is the fast route through the NSW planning system, and the one most homeowners hear about second — usually after someone has told them a DA will take a while. It is worth understanding properly, because whether your project can use it is not a matter of preference. The block decides, and it decides before you design anything.

What a CDC actually is

A CDC is a single certificate that covers both the planning approval and the construction approval for a project. One document, issued by a registered certifier or by your council, and no separate construction certificate afterwards. Applications are lodged through the NSW Planning Portal.

That combination is the first thing that makes it quicker. A DA gives you development consent and nothing else; you then need a construction certificate before work can start. A CDC does both at once.

The second thing is how it is assessed. A certifier issuing a CDC is not forming a view about whether your design is good, appropriate for the street, or sympathetic to the neighbours. They are checking it against a published list of standards in the State Environmental Planning Policy (Exempt and Complying Development Codes) 2008 — the Codes SEPP. Meet every one and the certificate can issue. Miss one and it cannot.

There is no discretion in either direction. A certifier cannot refuse a compliant proposal because they dislike it, and cannot approve a non-compliant one because the departure is trivial. That is the whole bargain: you give up flexibility and you get certainty.

What "complying" means in practice

The standards that apply depend on the code your project sits under — the Housing Code for a new house, the Low Rise Housing Diversity Code for a dual occupancy, the Housing Alterations Code for work to an existing home, and so on. Across all of them you are measured on much the same things:

  • Maximum building height, and wall height, measured from existing ground level
  • Setbacks from the front, side and rear boundaries
  • Maximum floor area, and site coverage
  • Minimum landscaped area, often as a percentage of the lot
  • Private open space: a minimum area, with a minimum dimension
  • Privacy — window placement and sill heights relative to boundaries
  • Cut and fill limits
  • Car parking and driveway requirements

Every one of them is a number, and every number has to be met. This is why a CDC design is a different exercise from a DA design: the work is in using the envelope fully without stepping outside it anywhere.

When your block does not qualify

Complying development is excluded on a range of land, and the exclusions are mapped rather than argued. The ones that come up most often on Sydney blocks:

  • Heritage. A heritage item, or a lot inside a heritage conservation area.
  • Flood control lots, as identified by your council's flood mapping.
  • Bushfire-prone land, depending on the category and the type of development proposed.
  • Environmentally sensitive land, and land containing declared critical habitat.
  • Foreshore areas, and land reserved for a public purpose.
  • Unsewered land.
  • Lot size or frontage below the minimum the relevant code sets. For a secondary dwelling under the Housing SEPP, for instance, the complying development pathway generally needs a lot of at least 450 m², unless the dwelling sits entirely within the existing house.

Easements and Sydney Water assets are a separate matter. They do not exclude complying development as such, but a proposed footprint sitting over a sewer main is a problem you have to solve regardless of pathway.

A Section 10.7 planning certificate from your council lists most of this for your specific lot. It is the first document we ask for, because it answers the pathway question before anyone commits to a design.

What it means for the drawings

A CDC set is leaner than a DA set — no statement of environmental effects, usually fewer supporting reports — but it is less forgiving. Every dimension the certifier will check has to be shown and has to comply: setbacks to each boundary, wall and ridge heights from existing ground level, landscaped area as a calculated percentage, private open space with its dimensions marked, cut and fill depths.

One figure outside a standard and the certificate cannot issue, which means the drawings are checked against the code before they are lodged rather than after. A survey matters more here than anywhere, because every height is measured from existing ground level and an assumed level is a guess that fails at assessment.

When a DA is the better answer anyway

Qualifying for a CDC does not always mean using it. If the code-compliant envelope produces a worse house — the living areas facing the wrong way, a tree you wanted to keep standing where the building has to go, a setback that wastes the only usable part of the block — then the flexibility of a DA may be worth the longer path.

That is a genuine design decision rather than an administrative one, and it is worth making deliberately. Our DA vs CDC guide compares the two properly.

Finding out which applies to you

Send us the address and a short description of what you would like to build. We check the zone, the lot dimensions, the relevant code and the mapped constraints, and tell you whether complying development is open to you — and if it is, what it would cost you in design terms to take the other path instead.

DA and CDC drafting in Sydney · Duplex site check · Granny flats in NSW

Common questions

What is a CDC used for?

New houses, secondary dwellings, dual occupancies, alterations and additions, and a range of smaller works, where the land is not excluded and the design meets every standard in the relevant code. It is the fast-track pathway for projects that fit the code exactly.

Is a CDC cheaper than a DA?

The documentation is generally leaner, because there is no statement of environmental effects and usually fewer supporting reports. The design work is not necessarily lighter, since every standard has to be met exactly. The larger saving is usually in time rather than in drawings.

Who issues a CDC in NSW?

A registered certifier, in private practice or employed by your council. The application is lodged through the NSW Planning Portal. The certifier checks the proposal against the Codes SEPP and issues the certificate if every standard is met.

Do I still need a construction certificate after a CDC?

No. A CDC covers planning and construction approval in the one certificate. That is one of the main differences from a DA, which gives development consent only and needs a separate construction certificate before work starts.

What stops a block qualifying for complying development?

Most commonly heritage listing or a heritage conservation area, flood mapping, certain bushfire categories, environmentally sensitive land, foreshore areas, unsewered land, or a lot below the minimum size the code requires. A Section 10.7 planning certificate from council lists what applies to your lot.

Next step

Tell us about your project.

Talk to Sam, our Marketing & Operations Manager

Send us your address and what you'd like to do. We'll check the zone, the lot and your council's controls, and come back with the likely approval path and a fee proposal. Every project is quoted on its own.

We reply the same business day.